My story board was a way for me to put all of my ideas on paper. Creating a storyboard is a great way to express all of your ideas. Formulating a storyboard also makes it a lot easier to see potential changes that will be needed. Changes were needed on my storyboard.
Things such as the camera techniques selected as well as entire shots were needed to be changed. Scenes such as Alyssa talking with her friends at school were changed. These shots were replaced with Alyssa and Lauren texting as well as talking on the phone. The pictures below showcase the new and improved storyboard. This storyboard included much more description as well as new scenes.
Comments
Post a Comment