Blog Post #47 Producing CCR # 2

      To answer the second CCR question I created a podcast. This podcast begins with a very intriguing opening. This opening includes a spooky background with red text that slowly appears on the screen. These letters are accompanied by a typing noise to create a more intriguing appeal. This opening was necessary in order to continue with the eerie theme that is present in my sequence. I wanted to bring this feeling into my podcast. As a result of this idea, i added the creepy background music as well as the unsettling opening. To properly read our lines, i printed out the script and then and Kryscelle hold the script in front of her. This allowed me to read my script as well as create eyeline match. This also worked flawlessly due to the fact that i had planned on doing over the shoulder shots anyways. 


                                     Podcast Title/intro picture. 

     To create a professional appeal, we used mini lavalier microphones to fully enhance the idea that it is a podcast. I also included a sincere shoutout to my actors to allow viewers to understand the significance they had during the process. The several different angles keeps the podcast from being boring. This also allows me to showcase my technique by using over-the shoulder shots as well as a two-shot at the end. The two-shot at the end allows viewers to understand the producer actor connection between me and Kryscelle. This podcast involved extensive editing. To achieve this i used the split effect to cut the shots in half to then add the new perspective. This is what created those different point of views and the over the shoulder shots. 

Comments